This research applies Project Evaluation and Review Technique (PERT) model to estimate acceptable duration for execution of each activity having random variable of time and some probability distribution for sand dredging operation in Niger Delta. The study takes into account proper planning, scheduling, controlling and allotment of dredging activities time using a project network model PERT. The model evaluated how acceptable time and saving cost could be achieved in a scenario of activities having random time variables. Readily available data of activities time from 2014 – 2017 were used to analyze the time estimate for various activities at a selected dredge site Aleto-Eleme in Port Harcourt metropolis Rivers State-Nigeria. The PERT was applied for the data analysis, to construct the PERT scheme for the dredging operations. Finally, parametric control for project evaluation and review techniques of acceptable time for the dredging activities were determined.

References

  1. Verzuh, E. (1999) The Fast Forward MBA in Project Management, John Wiley and Sons. Inc.
     Google Scholar
  2. Sharma J. K, (2009), Operations Research Theory and Application, Macmillan Publisher, India.
     Google Scholar
  3. Linda, Main, “CPM and PERT in Library Management”, Special Libraries winter, vol. 80, 1989, No. 1.
     Google Scholar
  4. Steyn H. (2003). Project Management Applications of the Theory of Constraints beyond Critical Chain Scheduling. International Journal of Project Management, 20, 76-81.
     Google Scholar
  5. Rogelio, A (2010). Analysis of Project Planning Using CPM and PERT. Department of Computer and Mathematical Sciences.
     Google Scholar
  6. Anna, H. (2011) Project Evaluation Applying the PERT and Critical Chain Method. (Diploma Thesis, Mendelu University in Brno, Czech Republic).
     Google Scholar
  7. Machineering Dredging Solutions Ltd (Company dredging log book, 2017) Morgan, Kelli, Rand (1957).
     Google Scholar
  8. Fiala, P., (2008). Rizeni Project Praha; Economic. 1980s.
     Google Scholar
  9. Fortranch Sea Tech. Services Ltd, 2017; Community Participatory Contractual lecture.
     Google Scholar
  10. Ali, Goksu Selma & Catovic (2012) Implementation of Critical Path Method and Project Evaluation and Review Technique”, 3rd International Symposium on Sustainable Development May 31 – June 01 2012, Sarajevo.
     Google Scholar
  11. Dredge mechanical supervision and weekly reports 2010, Johnson
     Google Scholar
  12. Fortranch Sea Tech. Services Ltd, 2017; Community Participatory Contractual lecture.
     Google Scholar
  13. Fortranch Sea Tech. Services Ltd, 2017; Community Participatory Contractual lecture.
     Google Scholar
  14. Machineering Dredging Solutions Ltd (Company dredging log book, 2017).
     Google Scholar
  15. Cook, S. (1998) Applying Critical Chain to Improvement to Management of Uncertainty in Projects. (online). 1998 available from www.pqa.net [accessed 5 July, 2018].
     Google Scholar